Out of the Gate…2017-18 Season is on the Way
No doubt you have heard that Bear Valley is replacing Bear Chair with a new, high speed “six pack” lift that is planned to be in operation at the start of the season. The lift will terminate about 50 ft. beyond the Bear Chair top giving even easier access to the backside. We can’t wait